Sign In

Nine Mile Point Unit 2 Offline

Nine Mile Point Unit 2 automatically shut down Saturday during testing of valves on the non-nuclear side of the plant

​OSWEGO, N.Y. – Nine Mile Point Unit 2 automatically shut down at 10:35 p.m. Saturday during testing of valves on the non-nuclear side of the plant.  While the unit is offline, water vapor from the cooling tower will be absent. Plant technicians will inspect, repair and fully test the valves before returning Unit 2 to service.  

Nine Mile Point Unit 1 remains online. The Unit 2 outage will not impact electrical service to customers.

The Nine Mile Point Nuclear Station is located seven miles northeast of Oswego and 50 miles north of Syracuse. The station can produce more than 1,937 megawatts of carbon-free electricity – enough to power nearly two million homes.

 

 

 

New Fuel Loaded for 2018 RFO<p>​<span style="color:#606060;">Ninety-six new AREVA fuel assemblies have been unpacked, inspected and loaded in Calvert Cliffs’ spent fuel pool in preparation for the 2018 Unit 1 refueling outage.</span></p><img alt="" src="/newsroom/PublishingImages/12%202017%20Calvert%20Fuel/spent%20fuel%20pool%20rollup.jpg" style="BORDER:0px solid;" />http://www.exeloncorp.com/newsroom/new-fuel-loaded-for-2018-rfoNew Fuel Loaded for 2018 RFO12/8/2017 10:00:00 PM
Augustana College Energy Students Get a Firsthand Look at How Quad Cities Station Operates<p>​Twenty-two students and two professors from Augustana College’s Sustainable Energy Learning Community visited Quad Cities Station to learn about nuclear power and get a firsthand look at how a nuclear plant operates. </p><img alt="" src="/newsroom/PublishingImages/12%202017%20Quad%20Cities%20Augustana/quad%20rollup.jpg" style="BORDER:0px solid;" />http://www.exeloncorp.com/newsroom/augustana-college-energy-students-get-a-firsthand-look-at-how-quad-cities-station-operatesAugustana College Energy Students Get a Firsthand Look at How Quad Cities Station Operates12/7/2017 4:00:00 PM
Oyster Creek Siren Test Scheduled for December 5http://www.exeloncorp.com/newsroom/oyster-creek-siren-test-scheduled-for-december-5Oyster Creek Siren Test Scheduled for December 512/1/2017 9:00:00 PM
Exelon Generation to Test Public Notification System on December 5http://www.exeloncorp.com/newsroom/exelon-generation-to-test-public-notification-system-on-december-5Exelon Generation to Test Public Notification System on December 512/1/2017 8:00:00 PM

Share