Sign In

 

 

 

 

 

Criterion Wind Project<div class="intro-content copy-section">​​​​Criterion Wind Project is located on Backbone Mountain in Garrett County, Maryland. The 70 MW project consists of 28 turbines and went into commercial operation in December 2010. Old Dominion Electric Cooperative has a 20-year power purchase agreement to purchase the output and renewable energy credits produced by Criterion. </div><div class="grouper"><div class="row"><div class="grouper-section"> </div>​ <div class="section-header"><h4>Generating more low-carbon electricity​</h4></div><div class="grouper-content"><div class="cta-generic"><p>Exelon is America's 12th largest wind producer, with 47 projects in 10 states and nearly 1,500 megawatts of power. Wind power captures the natural, renewable energy source in our atmosphere and converts it to electricity.</p></div></div></div></div>Criterion Wind Project

​​

 

 

 

Criterion Wind ProjectGP0|#036d7cad-49e3-4a98-8821-efa704301d6d L0|#0036d7cad-49e3-4a98-8821-efa704301d6d|Exelon Generation GTSet|#bb697efb-4d63-4298-b4d0-ab279caf3fe8http://www.exeloncorp.com/locations/Lists/Locations/DispForm.aspx?ID=579Criterion Wind Project

About this facility

Directions