​Date​​​​​Name​Link
​2012​​Documents include:
  • 09/17/2012 - Impact of Plant Operations on Migratory Fish Reproduction 2012 Ichthyoplankton Sampling Conowingo RSP 3.21
  • 08/30/2012 - Application for New License for Major Water Power Project-Existing Dam: Conowingo Hydroelectric Project, FERC Project No. 405, Volume 1: Initial Statement; Exhibit A – Project Description; Exhibit B – Project Operations and Resource Utilization; Exhibit C – Construction History and Proposed Construction Schedule; Exhibit D – Statement of Cost and Financing; Exhibit E – Environmental Report; Exhibit F – General Design Drawings and Supporting Design Report; Exhibit G – Project Boundary Maps; Exhibit H – Plans and Ability of Applicant to Operate the Project
  • 08/30/2012 - Application for New License for Major Water Power Project-Existing Dam: Conowingo Hydroelectric Project, FERC Project No. 405, Volume 3:  Recreation Management Plan; Shoreline Management Plan
  • 08/30/2012 - Final Study Report Seasonal and Diurnal Water Quality in Conowingo Pond and below Conowingo Dam RSP 3.1
  • 08/30/2012 - Estimation of Survival of Adult American Shad Passed Through Francis and Kaplan Turbines;  Final Study Report Estimation of Survival of Juvenile American Shad Passed Through Francis Turbine; Final Study Report Downstream Fish Passage Effectiveness Assessment Conowingo RSP 3.2
  • 08/30/2012 - Final Study Report Biological and Engineering Studies of American Eel at Conowingo Pond RSP 3.3
  • 08/30/2012 - Final Study Report Biological and Engineering Studies of American Eel at Conowingo Pond 2011 Eel Sampling below Conowingo Dam RSP 3.3
  • 08/30/2012 - Final Study Report Biological and Engineering Studies of American Eel at Conowingo Pond 2010 Eel Sampling below Conowingo Dam Conowingo RSP 3.3
  • 08/30/2012 - American Shad Passage Study: Susquehanna River American Shad Model, Model Production Runs; Final Study Report American Shad Passage Study: Susquehanna River American Shad Model, Model Development Conowingo RSP 3.4
  • 08/30/2012 - Analysis of the 2010 American Shad Radio Telemetry Animations; Upstream Fish Passage Effectiveness Study RSP 3.5
  • 08/30/2012 - Final Study Report Conowingo East Fish Lift Attraction Flows Statistical Analysis of Turbine Operations and East Fish Lift Catch; Conowingo East Fish Lift Attraction Flows Conowingo RSP 3.6
  • 08/30/2012 - Final Study Report Fish Passage Impediments Study Analysis of 2010 Radio Telemetry Data Conowingo RSP 3.7
  • 08/30/2012 - Final Study Report Downstream Flow Ramping and Stranding Study Conowingo RSP 3.8
  • 08/30/2012 - Final Study Report Biological and Engineering Studies of the East and West Fish Lifts RSP 3.9
  • 08/30/2012 - Final Study Report Maryland Darter Survey RSP 3.10
  • 08/30/2012 - Final Study Report Operations Modeling Baseline and Production Run Report Addendum to Conowingo RSP 3.11 and Muddy Run RSP 3.2; Final Study Report Operations Modeling Calibration Report Addendum to Conowingo RSP 3.11 and Muddy Run RSP 3.2; Final Study Report Hydrologic Study of the Lower Susquehanna River Conowingo RSP 3.11
  • 08/30/2012 - Final Study Report Water Level Management Study Conowingo RSP 3.12
  • 08/30/2012 - Final Study Report Study to Assess Tributary Access in Conowingo Pond RSP 3.13
  • 08/30/2012 - Final Study Report Debris Management Study Conowingo RSP 3.14
  • 08/30/2012 - Final Study Report Sediment Introduction and Transport Conwingo RSP 3.15
  • 08/30/2012 - Final Study Report Instream Flow Habitat Assessment below Conowingo Dam RSP 3.16
  • 08/30/2012 - Final Study Report Downstream EAV/SAV Study Conowingo RSP 3.17
  • 08/30/2012 - Final Study Report Characterization of Downstream Aquatic Communities Conowingo RSP 3.18
  • 08/30/2012 - Freshwater Mussel Characterization Study below Conowingo Dam RSP 3.19
  • 08/30/2012 - Final Study Report Summary Salinity and Salt Wedge Encroachment Study Conowingo RSP 3.20
  • 08/30/2012 - Final Study Report Impact of Plant Operation on Migratory Fish Reproduction RSP 3.21
  • 08/30/2012 - Final Study Report Shortnose and Atlantic Sturgeon Life Histories Studies Conowingo RSP 3.22
  • 08/30/2012 - Final Study Report Study to Identify Habitat Use Areas for Bald Eagle Conowingo RSP 3.23
  • 08/30/2012 - Final Study Report Summary Dreissenid Mussel Monitoring Study Conowingo RSP 3.24
  • 08/30/2012 - Final Study Report Conowingo Pond Creel Survey RSP 3.25A and Final Study Report Lower Susquehanna River Creel Survey Conowingo RSP 3.25B
  • 08/30/2012 - Final Report Historic Structures Report for the Conowingo Hydroelectric Project Relicensing Application Hardford and Cecil Counties, Maryland; Final Report Historic Structures Report for the Conowingo Hydroelectric Project Relicensing Application Drumore, Martic and Fulton Townships, Lancaster County and Lower Chanceford and Peach Bottom Townships, York County, Pennsylvania Conowingo 3.28
  • 08/30/2012 - Final Study Report Effect of Project Operations on Downstream Flooding Conowingo RSP 3.29
  • 08/30/2012 - Final Study Report Osprey Nesting Survey Conowingo RSP 3.30
  • 08/30/2012 - Final Study Report Black-Crowned Night-Heron Nesting Survey RSP 3.31
  • 04/01/2012 - Conowingo Draft License Application
  • 01/23/2012 - Updated Study Report Seasonal and Diurnal Water Quality in Conowingo Pond and below Conowingo Dam RSP 3.1
  • 01/23/2012 - Updated Study Report Downstream Fish Passage Effectiveness Study RSP 3.2
  • 01/23/2012 - Updated Study Report Biological and Engineering Studies of American Eel at Conowingo Pond RSP 3.3
  • 01/23/2012 - Updated Study Report American Shad Population Model RSP 3.4
  • 01/23/2012 - Updated Study Report Upstream Fish Passage Effectiveness Study RSP 3.5
  • 01/23/2012 - Updated Study Report Conowingo East Fish Lift Attraction Flows RSP 3.6
  • 01/23/2012 - Updated Study Report Fish Passage Impediments Study RSP 3.7
  • 01/23/2012 - Updated Study Report Downstream Flow Ramping and Stranding Study RSP 3.8
  • 01/23/2012 - Updated Study Report Biological and Engineering Studies of the East and West Fish Lifts RSP 3.9
  • 01/00/1900 - 
  • 01/23/2012 - Updated Study Report Maryland Darter Survey RSP 3.10
  • 01/23/2012 - Updated Study Report Hydrological Study of the Lower Susquehanna River RSP 3.11
  • 01/23/2012 - Updated Study Report Water Level Management Study RSP 3.12
  • 01/23/2012 - Updated Study Report Study to Assess Tributary Access in Conowingo Pond RSP 3.13
  • 01/23/2012 - Updated Study Report Debris Management Study RSP 3.14
  • 01/23/2012 - Updated Study Report Sediment Introduction and Transport RSP 3.15
  • 01/23/2012 - Updated Study Report Instream Flow Habitat Assessment below Conowingo Dam RSP 3.16
  • 01/23/2012 - Updated Study Report Downstream EAV/SAV Study RSP 3.17
  • 01/23/2012 - Updated Study Report Characterization of Downstream Aquatic Communities RSP 3.18
  • 01/23/2012 - Updated Study Report Freshwater Mussel Characterization Study below Conowingo Dam RSP 3.19
  • 01/23/2012 - Updated Study Report Summary Salinity and Salt Wedge Encroachment Study RSP 3.20
  • 01/23/2012 - Updated Study Report Impact of Plant Operation on Migratory Fish Reproduction RSP 3.21
  • 01/23/2012 - Updated Study Report Shortnose and Atlantic Sturgeon Life Histories Studies RSP 3.22
  • 01/23/2012 - Updated Study Report Study to Identify Habitat Use Areas for Bald Eagle RSP 3.23
  • 01/23/2012 - Updated Study Report Summary Dreissenid Mussel Monitoring Study RSP 3.24
  • 01/23/2012 - Updated Study Report Conowingo Pond Creel Survey RSP 3.25A and Updated Study Report Lower Susquehanna River Creel Survey RSP 3.25B
  • 01/23/2012 - Updated Study Report Recreation Facility Inventory and Estimated Recreation Use Report RSP 3.26
  • 01/23/2012 - Updated Study Report Interim Shoreline Management Report RSP 3.27
  • 01/23/2012 - Updated Study Report Phase IA Archaeological Study and Preliminary Historic Structures Assessment RSP 3.28 and Phase IB Archaeological Study and Phase II Historic Structures Assessment Components RSP 3.28
  • 01/23/2012 - Updated Study Report Effect of Project Operations on Downstream Flooding RSP 3.29
  • 01/23/2012 - Updated Study Report Osprey Nesting Survey RSP 3.30
  • 01/23/2012 - Updated Study Report Black-Crowned Night-Heron Nesting Survey RSP 3.31
ZIP 1
ZIP 2
ZIP 3
ZIP 4
ZIP 5
ZIP 6
ZIP 7
ZIP 8
ZIP 9
ZIP 10
ZIP 11
ZIP 12
ZIP 13
ZIP 14
ZIP 15
ZIP 16
ZIP 17
2011​​Documents include:
  • 11/17/2011 - Updated Study Report Study to Identify Habitat Use Areas for Bald Eagle RSP 3.23
  • 11/17/2011 - Updated Study Report Osprey Nesting Survey RSP 3.30
  • 11/17/2011 - Updated Study Report Black-Crowned Night-Heron Nesting Survey RSP 3.31
  • 08/26/2011 - Initial Study Report Biological and Engineering Studies of American Eel RSP 3.3
  • 06/02/2011 - Initial Study Report Operations Modeling Calibration Report Conowingo RSP 3.11 and Muddy Run RSP 3.2
  • 06/02/2011 - Initial Study Report Conowingo Pond Creel Survey RSP 3.25A
  • 05/27/2011 - Initial Study Report Biological and Engineering Studies of the East and West Fish Lifts RSP 3.9
  • 05/27/2011 - Initial Study Report Lower Susquehanna River Creel Survey RSP 3.25B
  • 05/06/2011 - Initial Study Report Sediment Introduction and Transport Study RSP 3.15
  • 05/06/2011 - Initial Study Report Instream Flow Habitat Assessment below Conowingo Dam RSP 3.16
  • 04/29/2011 - Study Report Water Level Management Study RSP 3.12
  • 04/29/2011 - Initial Study Report Downstream EAV/SAV Study RSP 3.17
  • 03/31/2011 - Initial Study Report Downstream Fish Passage Effectiveness Assessment RSP 3.2
  • 03/29/2011 - Initial Study Report Seasonal and Diurnal Water Quality in Conowingo Pond and below Conowingo Dam RSP 3.1
  • 03/24/2011 - Initial Study Report Phase 1A Archaeological Study and Preliminary Historic Structures Assessment Report  RSP 3.28  This report contains information regarding specific locations of archaeologically sensitive resources, and as such is being filed as Privileged with FERC
  • 02/22/2011 - Initial Study Report Summary Seasonal and Diurnal Water Quality in Conowingo Pond and below Conowingo Dam RSP 3.1
  • 02/22/2011 - Initial Study Report Summary Downstream Fish Passage Effectiveness Study RSP 3.2
  • 02/22/2011 - Initial Study Report Summary Biological and Engineering Studies of American Eel at Conowingo Pond RSP 3.3
  • 02/22/2011 - Initial Study Report Summary Upstream Fish Passage Effectiveness Study RSP 3.5
  • 02/22/2011 - Initial Study Report Summary Conowingo East Fish Lift Attraction Flows RSP 3.6
  • 02/22/2011 - Initial Study Report Summary Fish Passage Impediments Study RSP 3.7
  • 02/22/2011 - Initial Study Report Summary Downstream Flow Ramping and Stranding Study RSP 3.8
  • 02/22/2011 - Initial Study Report Summary Biological and Engineering Studies of the East and West Fish Lifts RSP 3.9
  • 02/22/2011 - Initial Study Report Summary Maryland Darter Survey RSP 3.10
  • 02/22/2011 - Initial Study Report Summary Hydrological Study of the Lower Susquehanna River RSP 3.11
  • 02/22/2011 - Initial Study Report Summary Water Level Management Study RSP 3.12
  • 02/22/2011 - Initial Study Report Summary Study to Assess Tributary Access in Conowingo Pond RSP 3.13
  • 02/22/2011 - Initial Study Report Summary Debris Management Study RSP 3.14
  • 02/22/2011 - Initial Study Report Summary Sediment Introduction and Transport RSP 3.15
  • 02/22/2011 - Initial Study Report Summary Instream Flow Habitat Assessment below Conowingo Dam RSP 3.16
  • 02/22/2011 - Initial Study Report Summary Downstream EAV/SAV Study RSP 3.17
  • 02/22/2011 - Initial Study Report Summary Characterization of Downstream Aquatic Communities RSP 3.18
  • 02/22/2011 - Initial Study Report Summary Freshwater Mussel Characterization Study below Conowingo Dam RSP 3.19
  • 02/22/2011 - Initial Study Report Summary Salinity and Salt Wedge Encroachment Study RSP 3.20
  • 02/22/2011 - Initial Study Report Summary Impact of Plant Operation on Migratory Fish Reproduction RSP 3.21
  • 02/22/2011 - Initial Study Report Summary Shortnose and Atlantic Sturgeon Life Histories Studies RSP 3.22
  • 02/22/2011 - Initial Study Report Summary Study to Identify Habitat Use Areas for Bald Eagle RSP 3.23
  • 02/22/2011 - Initial Study Report Summary Dreissenid Mussel Monitoring Study RSP 3.24
  • 02/22/2011 - Initial Study Report Summary Conowingo Pond Creel Survey RSP 3.25A
  • 02/22/2011 - Initial Study Report Summary Lower Susquehanna River Creel Survey RSP 3.25B
  • 02/22/2011 - Initial Study Report Summary Recreation Facility Inventory and Estimated Recreation Use Report RSP 3.26
  • 02/22/2011 - Initial Study Report Summary Interim Shoreline Management Report RSP 3.27
  • 02/22/2011 - Initial Study Report Summary Phase IA Archaeological Study and Preliminary Historic Structures Assessment RSP 3.28
  • 02/22/2011 - Initial Study Report Summary Effect of Project Operations on Downstream Flooding RSP 3.29
  • 02/22/2011 - Initial Study Report Summary Osprey Nesting Survey RSP 3.30
  • 02/22/2011 - Initial Study Report Summary Black-Crowned Night-Heron Nesting Survey RSP 3.31
  • 02/22/2011 - Initial Study Report Summary Re-Evaluate the Closing of the Catwalk to Recreational Fishing RSP 3.32​
ZIP 1
ZIP 2
ZIP 3
ZIP 4
ZIP 5
ZIP 6
​2010​Documents include:
  • 10/19/2010 - Conowingo Hydroelectric Project, Study Progress Report
  • 08/18/2010 - Exelon Response to the Maryland Department of the Environment's study dispute
  • 08/12/2010 - FERC Notification of Panel Meeting and Technical Conference Details
  • 07/21/2010 - FERC Notification of Dispute Resolution Process Schedule, Panel Meeting and Technical Conference
  • June 23, 2010 - Maryland Dept. of the Environment identifies panel member for the disputed studies
  • 06/18/2010 - FERC Ltr - Requesting Maryland Dept. of the Environment to select 1 panel member for the disputed studies
  • June 10,  2010 - Exelon Response to The Maryland Dept. of Natural Resources Notice of Dispute
  • June 3, 2010 - Maryland Dept. of Natural Resources FERC Filing “Explanation of How the Contested Studies Relate to the MD Dept. of Environment Water Quality Certification Authority Under § 401of the Clean Water Act.”
  • 05/20/2010 - FERC Order Denying Rehearing to Susquehanna River Basins Commission
  • 04/05/2010 - FERC Order Granting Rehearing for Further Consideration
  • 03/19/2010 - Maryland Dept. of Natural Resources Request for Rehearing
  • 03/08/2010 - Susquehanna River Basin Commission Request for Rehearing
  • 03/05/2010 - FERC Response to Maryland Dept. of Natural Resources Notice of Study Dispute
  • 02/24/2010 - Maryland Dept. of Natural Resources Initiate the Formal Study Dispute Resolution Process
  • 02/24/2010 - Susquehanna River Basin Commission Notice of Dispute to Study Plan Determination
  • 02/05/2010 - Susquehanna River Basin Commission Response to Exelon's 1/29/10 Supplemental Comments to the Revised Study Plan
  • 02/04/2010 - FERC Study Plan Determination
  • 02/03/2010 - Pennsylvania Dept. of Environmental Protection Response to Exelon's 1/29/10 Supplemental Comments to the Revised Study Plan
  • 02/03/2010 - U.S. Dept. of the Interior Response to Exelon's 1/29/10 Supplemental Comments to the Revised Study Plan
  • 02/03/2010 - Maryland  Dept of Natural Resources Response to Exelon's 1/29/10 Supplemental Comments to the Revised Study Plan
  • 01/29/2010 - Exelon Filing of Supplemental Comments to the Revised Study Plan
  • 01/21/2010 - U.S. Dept. of Commerce, National Oceanic and Atmospheric Administration Comments on Revised Study Plan
  • 01/20/2010 - Maryland Dept. of Natural Resources Comments on Revised Study Plan
  • 01/20/2010 - Pennsylvania Dept. of Environmental Protection Comments on Revised Study Plan
  • 01/20/2010 - Pennsylvania Fish & Boat Commission Comments on Revised Study Plan
  • 01/20/2010 - Susquehanna River Basin Commission Comments on Revised Study Plan
  • 01/20/2010 - Fish and Wildlife Service Comments on Revised Study Plan
  • 01/19/2010 - Nature Concervancy, Comments on Revised Study Plan
ZIP​
​2009Documents include:
  • 12/22/2009 - Revised Study Plan for the Conowingo Hydroelectric Project
  • 08/24/2009 - Proposed Study Plan for the Conowingo Hydroelectric Project
  • 08/24/2009 - Revised Scoping Document for Conowingo Hydroelectric Project, P-405 and Muddy Run Pumped Storage Project, P-2355
  • 07/13/2009 - Mason-Dixon Trail System, Study Request Letter
  • 07/10/2009 - American Rivers, Study Request Letter
  • 07/10/2009 - Federal Energy Regulatory Commission, Study Request Letter
  • 07/10/2009 - Lancaster County planning Commission, Study Request Letter
  • 07/10/2009 - Lower Susquehanna Riverkeeper, Study Request Letter
  • 07/10/2009 - Maryland Department of Natural Resources, Study Request Letter
  • 07/10/2009 - National Marine Fisheries Service, Study Request Letter
  • 07/10/2009 - Nature Conservancy, Study Request Letter
  • 07/10/2009 - Pennsylvania Department of Environmental Protection, Study Request Letter
  • 07/10/2009 - Susquehanna River Basin Commission, Study Request Letter
  • 07/10/2009 - U.S. Fish and Wildlife Service, Study Request Letter
  • 07/06/2009 - Ronald Steelman, Study Request Letter
  • 06/17/2009 - Alex Balboa, Study Request Letter
  • 06/11/2009 - Town of Port Deposit, Study Request
  • 05/11/2009 - Scoping Document for Conowingo Hydroelectric Project, P-405 and Muddy Run Pumped Storage Project, P-2355
  • 03/12/2009 - Conowingo Hydroelectric Project, FERC Project No. 405 Pre-Application ​Document​
ZIP