Skip Navigation

Muddy Run Relicensing Documents

Below are documents relating to the Muddy Run relicensing process.  Click on the year to view the documents for that year.

2012
Date Name Link
August 29, 2012 Application for New License for Major Water Power Project-Existing Dam: Muddy Run Pumped Storage Project, FERC Project No. 2355, Volume 1: Initial Statement; Exhibit A – Project Description; Exhibit B – Project Operations and Resource Utilization; Exhibit C – Construction History and Proposed Construction Schedule; Exhibit D – Statement of Cost and Financing; Exhibit E – Environmental Report; Exhibit F – General Design Drawings and Supporting Design Report; Exhibit G – Project Boundary Maps; Exhibit H – Plans and Ability of Applicant to Operate the Project PDF
PDF
August 29, 2012 Application for New License for Major Water Power Project-Existing Dam: Muddy Run Pumped Storage Project, FERC Project No. 2355, Volume 3: Recreation Management Plan; Shoreline Management Plan PDF
PDF
August 29, 2012 Final Study Report Muddy Run Water Quality Study Year 2 (2011) Sampling and Year 1 (2010) Sampling RSP 3.1 PDF
PDF
August 29, 2012 Final Study Report Hydrologic Study of Muddy Run Water Withdrawal and Return Characteristics RSP 3.2;
Final Study Report Operations Modeling Baseline and Production Run Report Addendum to Conowingo RSP 3.11 and Muddy Run RSP 3.2
and
Final Study Report Operations Modeling Calibration Report Addendum to Conowingo RSP 3.11 and Muddy Run RSP 3.2
PDF
August 29, 2012 Final Study Report Movement and Behavior of Telemetered Emigrating American Eel in the Vicinity of the Muddy Run Project RSP 3.3 PDF
August 29, 2012 Final Study Report Impacts of Muddy Run Project on Conowingo Pond Fishes RSP 3.4 PDF
August 29, 2012 Final Study Report Near Field Effects of the Muddy Run Project on Migratory Fishes RSP 3.5 PDF
August 29, 2012 Final Study Report Muddy Run Project Effects on Migratory Fishes: Interactions with the PBAPS Thermal Plume RSP 3.6 PDF
August 29, 2012 Final Study Report Transmission Line Avian Interaction Study Muddy Run RSP 3.7 PDF
August 29, 2012 Final Study Report Study to Identify Habitat Use Areas for Bald Eagle Muddy Run RSP 3.8 PDF
August 29, 2012 Final Study Report Study to Identify Potential Habitat of Bog Turtle Muddy Run RSP 3.9A
and
Final Study Report Study to Identify Potential Habitat and Presence/Inferred Absence of Rough Green Snake Muddy Run RSP 3.9B
PDF
August 29, 2012 Final Study Report Creel Survey at Muddy Run Recreation Lake RSP 3.10 PDF
August 29, 2012 Final Study Report Visual and Audio Assessment of the Muddy Run Project RSP 3.13 PDF
August 29, 2012 Final Report Historic Structures Assessment Report for the Muddy Run Pumped Storage Project Relicensing Application Drumore and Martic Townships, Lancaster County and Lower Chanceford and Peach Bottom Townships, York County, Pennsylvania PDF
August 29, 2012 Final Study Report Osprey Nesting Survey Muddy Run RSP 3.15
PDF
April 2012 Muddy Run Draft License Application PDF
PDF
PDF
PDF
January 23, 2012 Updated Study Report Water Quality Study RSP 3.1 PDF
PDF
PDF
PDF
January 23, 2012 Updated Study Report Hydrological Study of Muddy Run Water Withdrawal and Return Characteristics RSP 3.2 PDF
PDF
January 23, 2012 Updated Study Report Study to Monitor Movement of Telemetered Silver American Eel Downstream of Conowingo Dam RSP 3.3 PDF
January 23, 2012 Updated Study Report Impacts of Muddy Run Project on Conowingo Pond Fishes RSP 3.4 PDF
January 23, 2012 Updated Study Report Near Field Effects of the Muddy Run Project on Migratory Fishes RSP 3.5 PDF
January 23, 2012 Updated Study Report Muddy Run Project Effects on Migratory Fishes: Interactions with the PBAPs Thermal Plume RSP 3.6 PDF
January 23, 2012 Updated Study Report Transmission Line Avian Interaction Study RSP 3.7 PDF
January 23, 2012 Updated Study Report Study to Identify Habitat Use Areas for Bald Eagle RSP 3.8 PDF
January 23, 2012 Updated Study Report Study to Identify Potential Habitat of Bog Turtle RSP 3.9A
and
Updated Study Report Study to Identify Potential Habitat of Rough Green Snake RSP 3.9B
PDF
January 23, 2012 Updated Study Report Creel Survey at Muddy Run Recreation Lake RSP 3.10 PDF
January 23, 2012 Updated Study Report Recreation Facility Inventory and Estimated Recreation Use Report RSP 3.11 PDF
January 23, 2012 Updated Study Report Interim Shoreline Management Report RSP 3.12 PDF
PDF
January 23, 2012 Updated Study Report Visual & Audio Assessment of the Muddy Run Project RSP 3.13 PDF
PDF
January 23, 2012 Updated Study Report Phase IA Archaeological Study and Preliminary Historic Structures Assessment RSP 3.14 PDF
January 23, 2012 Updated Study Report Osprey Nesting Survey RSP 3.15 PDF

 
2011
Date Name Link
November 17, 2011 Updated Study Report Study to Identify Habitat Use Areas for Bald Eagle RSP 3.8 PDF
November 17, 2011 Updated Study Report Osprey Nesting Survey RSP 3.15 PDF
May 16, 2011 Initial Study Report Muddy Run Water Quality Study RSP 3.1 PDF
April 29, 2011 Initial Study Report Hydrologic Study of Muddy Run Water Withdrawal and Return Characteristics RSP 3.2 PDF
April 29, 2011 Initial Study Report Creel Survey at Muddy Run Recreation Lake RSP 3.10 PDF
April 8, 2011 Initial Study Report Impacts of the Muddy Run Project on Conowingo Pond Fishes RSP 3.4 PDF
March 23, 2011 Initial Study Report-Phase 1A Archaeological Study and Preliminary Historic Structures Assessment Report (RSP 3.14) This report contains information regarding specific locations of archaeologically sensitive resources, and as such is being filed as Privileged with FERC PDF
February 22, 2011 Initial Study Report Summary Water Quality Study RSP 3.1 PDF
February 22, 2011 Initial Study Report Summary Hydrological Study of Muddy Run Water Withdrawal and Return Characteristics RSP 3.2 PDF
February 22, 2011 Initial Study Report Summary Study to Monitor Movement of Telemetered Silver American Eel Downstream of Conowingo Dam RSP 3.3 PDF
February 22, 2011 Initial Study Report Summary Impacts of Muddy Run Project on Conowingo Pond Fishes RSP 3.4 PDF
February 22, 2011 Initial Study Report Summary Near Field Effects of the Muddy Run Project on Migratory Fishes RSP 3.5 PDF
February 22, 2011 Initial Study Report Summary Muddy Run Project Effects on Migratory Fishes: Interactions with the PBAPs Thermal Plume RSP 3.6 PDF
February 22, 2011 Initial Study Report Summary Transmission Line Avian Interaction Study RSP 3.7 PDF
February 22, 2011 Initial Study Report Summary Study to Identify Habitat Use Areas for Bald Eagle RSP 3.8 PDF
February 22, 2011 Initial Study Report Summary Study to Identify Potential Habitat of Bog Turtle RSP 3.9A PDF
February 22, 2011 Initial Study Report Summary Study to Identify Potential Habitat of Rough Green Snake RSP 3.9B PDF
February 22, 2011 Initial Study Report Summary Creel Survey at Muddy Run Recreation Lake RSP 3.10 PDF
February 22, 2011 Initial Study Report Summary Recreation Facility Inventory and Estimated Recreation Use Report RSP 3.11 PDF
February 22, 2011 Initial Study Report Summary Interim Shoreline Management Report RSP 3.12 PDF
February 22, 2011 Initial Study Report Summary Visual & Audio Assessment of the Muddy Run Project RSP 3.13 PDF
February 22, 2011 Initial Study Report Summary Phase IA Archaeological Study and Preliminary Historic Structures Assessment RSP 3.14 PDF
February 22, 2011 Initial Study Report Summary Osprey Nesting Survey RSP 3.15 PDF

 
2010
Date Name Link
October 19, 2010 Muddy Run Pumped Storage Project, Study Progress Report PDF
July 15, 2010 FERC Order Denying Rehearing to Dept. of  Interior and Pennsylvania Dept. of Environmental Protection PDF
June 18, 2010 Pennsylvania Dept. of Environmental Protection submits article "Passage of Fish Eggs and Young through a Pumped Storage Generating Station" PDF
June 17, 2010 FERC Order Denying Rehearing to Exelon request re: Director’s amendment to the study plan determination PDF
June 4, 2010 U.S. Dept. of the Interior Request for Rehearing PDF
June 4, 2010 Pennsylvania Dept. of Environmental Protection Request for Rehearing PDF
May 20, 2010 FERC Order Denying Rehearing to Susquehanna River Basins Commission PDF
May 5, 2010 FERC Order Director's Formal Dispute Resolution Determination PDF
April 29, 2010 Pennsylvania Dept. of Environmental Protection Comments on Exelon's 4/28/10 Supplemental Factual Info Regarding Study Costs PDF
April 28, 2010 Exelon Filling of Supplemental Factual Information Regarding Study Cost PDF
April 15, 2010 FERC Ltr Findings and Recommendations of the Study Dispute Resolution Panel PDF
April 5, 2010 FERC Order Granting Rehearing for Further Consideration PDF
March 31, 2010 Dispute Meeting Transcript PDF
March 29, 2010 Exelon Request for FERC Rehearing for Eel study PDF
March 22, 2010 Exelon Filing of Supplemental Comments and Information to the Revised Study Plan PDF
March 16, 2010 FERC Notification of Dispute Resolution Panel Convening and Technical Conference PDF
March 8, 2010 Susquehanna River Basin Commission Request for Rehearing PDF
March 5, 2010 FERC Ltr - Requesting DOI and PDEP to select 1 panel member for the disputed studies PDF
March 3, 2010 FERC Order Susquehanna River Basin Commission's Notice of Study Dispute for the Muddy Run Project not considered for formal dispute resolution process PDF
March 2, 2010 Exelon Request to Dismiss the Susquehanna River Basin Commission Notice of Study Dispute PDF
March 1, 2010 Amendment of Study Plan Determination for the Muddy Run Pumped Storage Project PDF
February 24, 2010 The Dept. of Interior/Fish & Wildlife Service Notice of Study Dispute PDF
February 24, 2010 The Susquehanna River Basin Commission Notice of Study Dispute PDF
February 24, 2010 The Pennsylvania Dept. of Environmental Protection Notice of Study Dispute PDF
February 5, 2010 The Susquehanna River Basin Commission Response to Exelon's 1/29/10 Supplemental Comments to the Revised Study Plan PDF
February 4, 2010 Study Plan Determination for the Muddy Run Pumped Storage Project PDF
February 4, 2010 The Maryland Dept. of Natural Resources Response to Exelon's 1/29/10 Supplemental Comments to the Revised Study Plan PDF
February 3, 2010 The Pennsylvania Dept. of Environmental Protection Response to Exelon's 1/29/10 Supplemental Comments to the Revised Study Plan PDF
February 3, 2010 The U.S. Dept. of the Interior Response to Exelon's 1/29/10 Supplemental Comments to the Revised Study Plan PDF
January 20, 2010 The Susquehanna River Basin Commission Comments on Revised Study Plan PDF
January 20, 2010 The Pennsylvania Fish & Boat Commission Comments on Revised Study Plan PDF
January 20, 2010 The Fish and Wildlife Service Comments on Revised Study Plan PDF
January 20, 2010 The Pennsylvania Dept. of Environmental Protection Comments on Revised Study Plan PDF

 
2009
Date Name Link
December 22, 2009 Revised Study Plan for the Muddy Run Pumped Storage Project PDF
PDF
August 24, 2009 Proposed Study Plan for the Muddy Run Pumped Storage Project PDF
August 24, 2009 Revised Scoping Document for Conowingo Hydroelectric Project, P-405 and Muddy Run Pumped Storage Project, P-2355 PDF
July 10, 2009 American Rivers, Study Request Letter PDF
July 10, 2009 Federal Energy Regulatory Commission, Study Request Letter PDF
July 10, 2009 Lancaster County Planning Commission, Study Request Letter PDF
July 10, 2009 Lower Susquehanna Riverkeeper, Study Request Letter PDF
July 10, 2009 Maryland Department of Natural Resource, Study Request Letter PDF
July 10, 2009 National Marine Fisheries Service, Study Request Letter PDF
July 10, 2009 Nature Conservancy, Study Request Letter PDF
July 10, 2009 Pennsylvania Department of Environmental Protection, Study Request Letter PDF
July 10, 2009 Susquehanna River Basin Commission, Study Request Letter PDF
July 10, 2009 U.S. Fish and Wildlife Service, Study Request Letter PDF
May 11, 2009 Scoping Document for Conowingo Hydroelectric Project, P-405 and Muddy Run Pumped Storage Project, P-2355 PDF
March 12, 2009 Muddy Run Pumped Storage Project, FERC Project No. 2355 Pre-Application Document PDF
 
Documents